PENTHOUSES
Penthouses are a primary product of EAS OSC. These self-contained systems provide customers many advantages including reducing field installation costs and schedules, eliminating construction risk and virtually doing away with “budget creep.”
All EAS construction work is performed more safely with tradesmen working on the plant floor instead of on top of a roof. EAS OSC penthouse designs can integrate more equipment into a single unit thereby reducing valuable building square footage while maintaining critical service and maintenance access. Pre-commissioning and system checks can be performed in the plant prior to installation.
EAS OSC also significantly reduces the site man-hours needed for unit completion by the trades. This reduction lowers cost and saves time.
Flexible
Scalable
Reliable
Redundancy incorporated into each design
Accelerated Schedule
Traditional architectural finishes
Secure
Clean
Efficient Design
Lower operating cost
Decreased day one capital expenditure
Depreciates as a piece of equipment vs. real estate
Design incorporates all infrastructure down to rack level
Interior floor to steel clearance can exceed 12 feet
Custom design to meet the needs of the project
Minimize field labor
Improved jobsite safety
Cost Certainty
Eliminates Change Orders
Improved Quality with proven QA/QC system in manufacturing environment
BIM modeling
Pre-Commissioned
Reduces site logistics
Reduces or eliminates per diem
Single point of contact for coordination
Parallel construction
Designed to meet seismic criteria of site
Turnkey installation
Eliminates weather delays
Superior Maintenance and Serviceability incorporated into design
Energy Efficient
ETL and UL Labeling
Click the button below to download this page as a PDF.